Files
poky/documentation/dev-manual
Scott Rifenbark f7dbbd1879 dev-manual: Removed inc PR step from Quilt workflow
Fixes [YOCTO #7460]

There was a single occurrence of specifically calling out that PR
needed to be manually incremented in the workflow section of the
manual.  It was step 8 of the Quilt flow.  I deleted this step.
Previous edits to the set have included extensive instruction on using
a PR Service, which is basically what replaces the need for manually
updating PR as it was in the past.

(From yocto-docs rev: d8db2175225be45cb3f2b4d11f8281c5b1f40ad4)

Signed-off-by: Scott Rifenbark <scott.m.rifenbark@intel.com>
Signed-off-by: Richard Purdie <richard.purdie@linuxfoundation.org>
2015-03-19 12:38:17 +00:00
..